OmniaRouteWise

RouteWise ePOD for Omnia

From paper to proof in real time
[Presenter name] · PCG / MindRift · [Date]
SasolburgMaputoWindhoekLusaka

One delivery, two journeys

Today
▤
Paper triplicates
Printed and carried in the cab
✕
Border rejections
Missing stamp found at the post
?
Lost PODs
Damaged, unsigned or never returned
⚖
Manual reconciliation
Clerks match paper to invoice lines
9d
Days to invoice
Cash waits for the courier
With RouteWise
▢
Digital pack
On the phone, offline, 2 languages
✦
AI-checked packs
Gaps caught before release
✓
Verified evidence
GPS, time and hash on every capture
⇄
Auto-matched
POD to invoice, variances flagged
1d
Same-day invoice
Illustrative
Live product · 8 steps · about 6 minutes

Follow one truck
from Sasolburg to Matola

TRP-24471 · 640 bags of fertiliser · Matola Industrial, Maputo · via Lebombo / Ressano Garcia
▶ Follow TRP-24471

Why not off the shelf

CapabilityRouteWiseGeneric ePOD apps
Sign-and-stamp per SADC border post✓ Rules per country and postSingle signature per drop
Bilingual documents (EN / PT)✓ Templates and translation assistUsually English only
Multi-day offline capture✓ Encrypted queue, priority syncShort offline windows
AI document checks✓ Pack gaps, stamp legibility, ERP mismatchPhoto storage only
ERP integration✓ Order, invoice and credit note loopExport files
South African hosting✓ Johannesburg + Cape Town DROften offshore

One platform, built in phases

PHASE 1 · NOW
ePOD
Driver app, control tower, AI documents, reconciliation
PHASE 2
Planning
Load and route planning, border-aware ETAs
PHASE 3
Billing
Freight billing and subcontractor settlement
PHASE 4
Fleet
Maintenance, fuel, driver behaviour
PHASE 5
Analytics
Cost-to-serve, ESG, Power BI
Shared data layer · single sign-on · one audit trail · hosted in South Africa

A low-risk pilot

Sasolburg depot + Sasolburg → Maputo via Lebombo · 12 weeks
Discovery
Weeks 1–2
Pilot
Weeks 3–10 · 60 days live
Go-live decision
Weeks 11–12
95%
of PODs digital within 60 days
< 24 h
POD turnaround
0
lost PODs
⛨Paper runs in parallel during the pilot. Nothing is switched off until the success criteria are met.

Drivers first

★
Driver champions
One per shift at Sasolburg, trained first, paid for the role
▶
In-cab videos
Two-minute clips in English and Portuguese, stored offline
▤
Laminated guide
One card in every cab: sign-in, delivery, border, sync
3
Three taps
From stop to signature, with gloves, in sunlight

Team and governance

STEERING COMMITTEE · MONTHLY
Approves scope, budget and go-live
Omnia
Executive sponsor · owns the business case and final go-live call
Operations lead · depot readiness, drivers, process sign-off
IT lead · ERP integration, security and POPIA sign-off
PCG / MindRift
Delivery lead · plan, weekly status, risks and issues
Solution architect · design authority, integration, data model
Support · driver helpdesk 06:00–20:00, SLA reporting

Next steps

01
Approve the Sasolburg–Maputo pilot
02
Name the Omnia sponsor, ops lead and IT lead
03
Share baseline figures to replace the illustrative numbers
Discovery starts [date] · [presenter name]
1 / 9← → to navigate · R to restart